Winter break is over and work on The Labyrinth has slowed down, but it has not stopped. I have added 2 more tracks (with 6 unique elements between them) to the machine. The largest and most obvious track is a 8 foot arch bridge which spans the width of my room, crossing over my bed and desk. This track features several elements which I have never even attempted to build before, but it works perfectly.
The second track is a pinball-type element consisting of a 5 foot long sloping pegboard. The ball drops on to the board and gradually works its way through the pegs, exiting in one of 3 slots at the bottom. These 3 slots then lead into 3 different tracks, which all deposit the ball at the bottom of lift #3. The pegboard alone contains 1300 pieces.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment