K'nex Bridge Setup Begins


I extended the height of the main towers by another foot and placed both of them outside to begin attaching the road deck. The progress is very slow going because one 5-foot section of bridge takes an hour to construct due to the strength requirements. So far I have both of the lead-in ramps nearly completed, and some test cables in place balanced by a 7-foot section of the main span. The cables in this image are made of K'nex chain, but I will probably end up using rope due to piece limitations.